Tag: Line 5
Activists Drop ‘Stop Line 5’ Banner From Stone Arch Bridge, Urge Michigan to Block Enbridge Line 5 Tunnel Permits
Minneapolis, MN — Stop Line 5 activists dropped a huge banner that read “Stop Line 5” from the Stone Arch Bridge, which spans across the Mississippi River on Tuesday morning and called on Michigan Governor Gretchen Whitmer to “Deny the Line 5 tunnel permits.” One…
Line 5 Pipeline Reroute Endangers Maple Trees and Native Lifeways
Ashland, Wisconsin – Northern Wisconsin residents gathered to boil maple sap along the banks of the Bad River, on Canadian oil giant Enbridge’s pipeline easement for its 41-mile Line 5 reroute on March 29, 2026. Enbridge started construction activities in late February, despite numerous ongoing…
Enbridge’s Line 5 Reroute Blasts Through Bedrock Without Permits, Threatening the Great Lakes
Washburn, WI — Copper Falls State Park sits on some of Wisconsin’s most ancient bedrock. Enbridge wants to blast through it — and admits it isn’t sure exactly where to. The Line 5 reroute is blasting into the unknown through the Penokee-Gogebic Range, one of…
Indigenous Leaders Demand Halt to Enbridge Line 5 Reroute Construction in Wisconsin
Indigenous leaders and water protectors rallied on April 21 at the U.S. Army Corps of Engineers district headquarters in St. Paul to call for an immediate stay on Enbridge Line 5 construction in northern Wisconsin.
Protests Against Line 5 Continue in Wisconsin and the Courtrooms
“We need to avert an oil disaster in Lake Superior. We need to save our water and our future.” That was water protector Gina Peltier’s message this summer. Peltier is one of many water protectors in the Midwest organizing against Line 5 tar sands oil…
Enbridge Ordered to Shutdown Line 5 and Pay Bad River Band $5.1M
Ashland, WI — Canadian oil corporation Enbridge has been ordered to shut down its Line 5 tar sands oil pipeline and pay the Bad River Band of the Lake Superior Tribe of Chippewa Indians $5.1 million. Chief Judge William M. Conley of the U.S. District…