Army Corps Delays DAPL Easement

Washington, DC – On Monday, November 14, the Army Corps of Engineers said in a statement that “additional discussion and analysis” was “warranted” before they could grant an easement needed by Dakota Access Pipeline to start construction on land near Lake Oahe.

UPDATE: Army Corps…

Published November 14, 2016





Mississippi Stand Action Stops DAPL Construction in Iowa

Sandusky, IA – On Saturday, September 24th, 2016, a non-violent direct action out of the Mississippi Stand camp shutdown Dakota Access Pipeline construction at the point the pipeline will cross the Mississippi river at Sandusky, Iowa.
The action, which started with a six a.m. lock-down…

Published September 26, 2016

More results