Enbridge Oil

  • Direct Action in Minnesota as Line 3 Pipeline Approval Reversed

    June 5, 2019
    Near Park Rapids, MN – On Monday, June 3, 2019 three water protectors shut down work on power lines along the proposed Enbridge Line 3 tar sands oil pipeline by locking themselves to construction equipment. The same day, the Certificate of Need and Routing Permit…...
  • Judge Accepts Water Protectors’ Climate Change Necessity Defense

    July 15, 2018
    Duluth, MN – On Friday, July 13, the St. Louis County court accepted the use of a climate change necessity defense. The decision comes from a court case stemming from a January 12th, 2018, lockdown by 3 water protectors at a Wells Fargo Bank in…...
  • As Line 3 Oil Pipeline Decision Looms, Indigenous Resistance Increases

    June 26, 2018
    St. Paul, MN – The fate of Enbridge’s Line 3 Replacement (Oil) Pipeline, North America’s largest proposed infrastructure project, will be decided this week. The decision was originally designated to be made no later than June 27th but may be be delayed further. The Minnesota…...