15 miles south of Mandan, North Dakota – On the heels of yesterday’s action which halted Dakota Access Pipeline (DAPL) construction, once again, today, hundreds of water protectors caravaned to a DAPL work site to pray to that the Dakota Access Pipeline is stopped.

After…

North Dakota – On Tuesday, September 27, a contingent of over 100 water protectors from the Red Warrior, Oceti Sakowin, and Sacred Stone camps entered a Dakota Access Pipeline (DAPL) work site to stop construction and conduct prayer ceremonies.
Video posted to Facebook by the…

Sandusky, IA – On Saturday, September 24th, 2016, a non-violent direct action out of the Mississippi Stand camp shutdown Dakota Access Pipeline construction at the point the pipeline will cross the Mississippi river at Sandusky, Iowa.
The action, which started with a six a.m. lock-down…